Plant Expansion

sectors

The project was initiated from a Conceptual De-bottlenecking Study which proceeded into Basic Engineering and Construction on a Lump Sum Turnkey basis. The project was an immense success with over 75,000 LTI Free Hours achieved.  The project was completed with Zero-Variations

SAIYL performed both the Engineering and Construction in-house which included the following:

  • Filter Press Replacement
  • Filters
  • Storage Tanks
  • Pumps
  • Tanker Loading Facility
  • Piping Installation
  • Structural Installation
  • Roads
  • Electrical (MCC & Installation)
  • Control & Instrumentation