0.9km Gas Pipeline & PRS

The project involved the design and construction of a new 35Barg high pressure gas transmission pipeline from the Sasol transmission network to a customer. A high pressure reducing and metering station was also construction to drop the pressure to 2Barg.
The Client is major listed manufacturing company that utilizes gas as an energy source. SAIYL managed the project end-to-end from the initial concept stage through to the final commissioning.
The SAIYL multidisciplinary team managed the following: .

  • Pipeline Routing Study
  • NERSA Licenses
  • Environmental Impact Assessment
  • Major Hazardous Installation Study
  • Procurement
  • Construction Management
  • Commissioning
Summary
0.9km Gas Pipeline & PRS
Article Name
0.9km Gas Pipeline & PRS
Description
The project involved the design and construction of a new 35Barg high-pressure gas transmission pipeline from the Sasol transmission network to a customer.
Author
Publisher Name
SAIYL
Publisher Logo

 

Construction date: October 2019
Location: Vereeniging, South Africa
Value: R 19 M