The project involved the design and construction of a new 35Barg high pressure gas transmission pipeline from the Sasol transmission network to a customer. A high pressure reducing and metering station was also construction to drop the pressure to 2Barg.
The Client is major listed manufacturing company that utilizes gas as an energy source. SAIYL managed the project end-to-end from the initial concept stage through to the final commissioning.
The SAIYL multidisciplinary team managed the following: .