Steam & Condensate Project

The existing steam reducing station and reticulation was removed and replaced on two reactors. The project was performed on a brownfield site. The SAIYL multidisciplinary team managed the following:

  • Tank repairs & modifications
  • Steam piping
  • Pressure reducing station
  • Engineering
  • Procurement
  • Construction
  • Commissioning

 

Date: September 2017
Location: Johannesburg, South Africa